Rehabilitation of seven (07) water reservoirs of Boukoussera, Alafiarou and Botti-Houègbo with hydro-agricultural development at their downstream parts and installation of a mini solar station on each of the sites - Lot RTCHAOU (Commune of Tchaourou), (Commune of Ouèssè) and (Commune of Tchaourou)

Main Company:

Groupement GBETONDJI & COMPANY / BECO SA

Contracting Authority:

AGETUR

Physical size

Structural work

Complexity

High

Period

July 2020 – January 2021

Brief description of the work done:

Alafiarou :

  • Supply and installation of a 15.84kWp photovoltaic mini power plant on the site of Alafiarou with AC/DC protection boxes;
  • Supply and installation of a submersible pump of HMT = 70m, Q=30m3/h ;
  • Supply and installation of a remote monitoring system for the pumping station;
  • Commissioning and periodic maintenance ;

Botti-Houégbo :

  • Supply and installation of a 10.56kWp solar power plant on the site of Botti-Houégbo with AC/DC protection boxes;
  • Supply and installation of a submersible pump of HMT = 30m, Q=17m3/h ;
  • Supply and installation of a remote monitoring system for the pumping station;
  • Commissioning and periodic maintenance.

Boukoussera :

  • Supply and installation of a mini photovoltaic power plant of 17.82kWp on the site of Boukoussera with AC/DC protection boxes;
  • Supply and installation of a submersible pump of HMT = 70m, Q=30m3/h ;
  • Supply and installation of a remote monitoring system for the pumping station;
  • Commissioning and periodic maintenance.

We are positioning ourselves to become the N°1 Energy Efficiency intervention in Benin.