Our work for ENGIE POWER CORNER BENIN

Customer:

GIZ / Endev-BENIN

Physical size

Structural work

Complexity

High

Period

2019

Brief description of the work done:

  • Socio-economic feasibility study on productive uses in the framework of the off-grid electrification project for the submission of the OCEF call for projects.
    This study was conducted in the village of DOHOUE.
  • Socio-economic and technical feasibility study for the selection of localities favourable to the development of rural electrification projects for submission to the OCEF call for projects.
    This study was conducted in 45 locations.
  • Sociological survey mission for the selection of a village to carry out a pilot project for submission to the OCEF call for projects.
    This mission was conducted in 39 locations.

We are positioning ourselves to become the N°1 Energy Efficiency intervention in Benin.